Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 49 years, born on 1 June 1975
Vladivostok, not willing to relocate, prepared for business trips
Smartplant material coordinator
Specializations:
- Other
Employment: full time, project work
Work schedule: full day, flexible schedule
Work experience 19 years 8 months
November 2014 — currently
10 years 6 months
Worleyparsons
Oman, www.worleyparsons.com
Construction, Real Estate, Architecture... Show more
SmartPlant Material Administrator
1. Managed the Implementation of SmartPlant Materials system for the project, liaising with Project Management team and advise best practices for project use of the system.
2. Successfully implemented Buyer and Expediting using SmartPlant Materials.
3. Responsible for Requisitions for Procurement as per Engineering Specifications.
4. Responsible for Procurement Status Report.
5. Support the Lead Buyer and Lead Expeditor.
6. Support the Lead Project Engineer and Liaise with Engineers, Procurement and Site teams for receipt materials and creating OS&D
November 2012 — September 2014
1 year 11 months
Clough
Australia, www.clough.com.au
Construction, Real Estate, Architecture... Show more
Snr. Material Controller
1. Responsible for Free Issue Material Management from Client.
2. Responsible for Handling quarantine materials
3. Responsible for creating WorkPack for Forecasting/Reserved material to be fabricated
4. Support the Lead Project Engineer and Liaise with Engineers, Procurement, QC and at Fabrication yard.
5. Site Materials Management (MRRs, MIRs, OS&Ds)
6. Coordinated setting up project material control procedure for site
7. Issued Constructability and Expediting reports to the Project Management team Coordinated between Engineering, Procurement and Construction teams to define best methods of utilizing SPM and processes to deliver projects successfully.
January 2011 — October 2012
1 year 10 months
KBR
Indonesia, www.kbr.com
Construction, Real Estate, Architecture... Show more
Snr. Material controll
Responsible for Warehouse team to carry out receiving/Issuing material to site.
Following up with Expeditor and yard to be confident that all shortages are being auctioned to meet the planned completion dates.
Coordinate with QA/QC to perform the inspection for the material and raise the OSD if needed.
Following up the status of OSD witht the expeditor and buyer. Supervising/Monitoring warehousing team to carry out receiving/Issuing material to site.
September 2010 — December 2011
1 year 4 months
Rotary
Singapore
Construction, Real Estate, Architecture... Show more
Smartplant material manager
Responsible for implementation of SmartPlant Material system for the company.
Responsible for creation of material catalogue within SmartPlant Materials.
Created end-user manuals for each module of SmartPlant Materials
January 2008 — January 2010
2 years 1 month
Clough
Australia, www.clough.com.au
Snr. Material Controller
Project Set-up
Driving SPMat (Marian) through project processes and procedures for all module
Manage the all user in Project for all discipline.
Problem resolution and troubleshooting for all Module
Create user/Manage user
1. Ensure projects issue and manage controlled MTOs utilising templates via document control.
Material Management
• Co-ordinate with Procurement Manager and ensure all package are in place.
• Coordinate with Engineering Manager and ensure all Requisitions are in place.
• Coordinate with QA/QC to perform the inspection for the material.
• Supervising/Monitoring warehousing team to carry out receiving/Issuing material to site,
• Unpacking inspection and coordinate with procurement team for shortage and damage goods.
• Identifying shortages against MTO’s, outstanding items on requisitions and purchase orders through to shortfalls on site.
• Following up with expediting, logistics and yard to be confident that all shortages are being actioned to meet the planned completion dates.
• review status of receipts and issues to ensure they are up to date
January 2007 — January 2008
1 year 1 month
Foster Wheller
Malaysia
Construction, Real Estate, Architecture... Show more
Material controller
Identify material requirement and prepare material take-off from Engineering Drawing (P&ID, Plot-plan)
Responsible for the accuracy of bulk material take-offs and issued isometric drawings.
Interfaces with Design, Material Engineering and Purchasing to ensure the
January 2005 — January 2007
2 years 1 month
Clough
Australia, www.clough.com.au
Construction, Real Estate, Architecture... Show more
Material controller
Create Piping Material spec using MARIAN - Module MLCL
Enter project material specification into the material management system.
Prepare Project Contingency for requisitioning material
Prepares requisitions for Piping bulk materials and Specialty Items.
Responsible for the accuracy of bulk material take-offs and issued isometric drawings.
Interfaces with Design, Material Engineering and Purchasing to ensure the timely delivery of all necessary Piping Materials to construction site and/or fabrication shops.
Forecast material requirements throughout a project in conjunction with squad leaders based on model download reports.
Skills
Skill proficiency levels
Incomplete higher education
1998
Technical School Jakarta
civil, Smartplant Material; Snr. Material controller
Languages
Citizenship, travel time to work
Citizenship: Indonesia, Russia
Permission to work: Indonesia, Russia
Desired travel time to work: Doesn't matter